
Horizontal Plastic Injection Molding Machine Motor Change Mold Automatic
Yuyao Yingtu Mechanical Equipment Co., Ltd.- Warranty:1 Year
- Type:Preform Injection
- Structure:Horizontal
- Plastic Type:Thermoplastic
- Plasticizing Way:Screw Type
- Clamping Way:Hydraulic
Base Info
- Model NO.:YT-3280(1)
- Automation:Automatic
- Computerized:Computerized
- Certification:CE, ISO9001:2008, SGS
- Transport Package:Carton
- Specification:6.9*1.85*2.35
- Trademark:yingtu
- Origin:China
- HS Code:847710
- Production Capacity:50units,Month
Description
Basic Info.
Model NO. YT-3280(1) Automation Automatic Computerized Computerized Certification CE, ISO9001:2008, SGS Transport Package Carton Specification 6.9*1.85*2.35 Trademark yingtu Origin China HS Code 847710 Production Capacity 50units/MonthProduct Description
Servo series Low consumption and environment-friendly:
1). Economizing on electricity: Electric motor energy is carried out according to need. For high-precision products with long holding time and thick wall thickness, energy electricity can be economized 25%-80%.
2). Precision: Products re-precision is once higher than usual injection molding machine.
3). Control: Double closed circular control makes the pressure and speed equaler.
Examples of products that can be made
After-sales features:
Free: free program, free mold trial, free on-site training.
Energy saving: 40%-60% energy saving, 6-12 months back.
Safety: more than 100 customers have no safety problems.
Durability: 30 years service life.
Automation: can match manipulator, robot automation production.
Buy Yingtu model machine to save worry more comfortable.
Control mode | Standard Configuration(No opening loop control) |
Control computer | PORCHESON |
Oil pump | Domestic gear pump |
Power Motor | ZHENSHUN |
Servo Controller | ZHENSHUN |
Reversing valve | Joint venture valve |
Electronic ruler | Chinese Brand |
Five-star motor | DANDUN |
Limitted switch | Omron |
Mould adjusting motor | DANDUN |
Relay | Omron |
Solid state relay | Chinese Brand |
Oil seal | HALLITE England |
1.Lead time: 40 days after PO date
2.30% T/T in deposit
3.Full payment before shipment
4.FOB Ningbo port.