-
700-1500kg/H 20-90mm XPS Foam Board Extrusion Line
Overview Product DescriptionProduct ParametersCompany ProfileCertificationsInstallation InstructionsThe initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All nec
-
PVC Pipe Making Machine Production Line Double Pipe Machine
1.PRODUCTION INTRODUCTIONPVC pipe extrusion machine has features of low energy consumption, high output, stable running etc.The standard PVC pipe extrusion machine include: material feeder, SJSZ series conic twin screwextruder, mould, vacuum calibration tank, spray cooling tank, haul-off, cutter, st
-
Reanin-K3000 Portable Polyurethane Foam Wall Insulation Spraying Machine
PRODUCT DESCRIPTIONDETAILED PARTSFAQQ: Are you the factory or trade company? A:We are the factory,found in 2016. Q: Can you provide tutorials? A:Of course.We also provide links to machine operation videos and machine operation manuals. Q: What's the delivery time? A: We can send the machine within
-
Recycled Pet Bottles to Polyester Fiber Machine
Intrinsic Viscosity (IV) (dl/g)0.65-0.86 (depends on raw materials)Melt point (ºC)252-260Moisture0.5-0.7%Bulk density (kg/m3)280-450Particle size (mm)3-12Fraction1-3mm8-15%≤1mmMax. 2%PH Value7.5±0.5PVC (ppm)Max. 10PE/PP (ppm)Max. 15Label(ppm)Max. 15Glue (ppm)Max. 10Metal (ppm)Max. 10T
-
Reanin-K2000 High Pressure Polyurethane Foam Spray Machine PU Foam Machine
-
Reanin-K2000 Polyurethane Foaming Insulation Spray Machine
-
CO2 XPS Foam Board Production Line
Overview Product DescriptionProduct ParametersCompany ProfileCertificationsInstallation InstructionsThe initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All nec
-
CO2 Environmental XPS Extruder Machine Foam Board Extruder Production Line
Overview Product DescriptionProduct ParametersCompany ProfileCertificationsInstallation InstructionsThe initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All nec