Plastic Machinery

Super Size Water Tank Blow Molding Machine

Qingdao Yankang Plastic Machinery Co., Ltd.
  • Type:Extrusion Blow Molding Machine
  • Raw Material:HDPE
  • Making Method of Parison:Extrusion-Blow Molding
  • Automation:Automatic
  • Computerized:Computerized
  • Certification:CE, ISO9001:2008

Base Info

  • Model NO.:YK3000L-2
  • 3000L:Two Layers
  • Transport Package:Wooden Package
  • Trademark:YANKANG
  • Origin:Qingdao
  • HS Code:8477301000
  • Production Capacity:30 Sets,Year

Description

PARISION CONTROL THINCKNESS CONTROLMOOGJAPANPLCSEIMENSGERMANYTEMPERATURE CONTROL MODULESEIMENSGERMANYSERVO VALVE & SERVO TRANSDUCERMIRANITALYINVERTERSEIMENSGERMANYHYDRAULIC OIL SEALDZTAIWANINTERMEDIATE RELAYOMRONJAPANPNEUMATIC VALVEAIRTECHTAIWANHYDRAULIC PUMP & VALVEYUKENJAPANPNEUMATIC SWITCH & CONTACTORSEIMENSGERMANYHYDRAULIC MOTOR & SCREW MOTORSEIMENSGERMANYREDUCERGUOMAOCHINAProduction rate
Of 1000 ltr.Productivity12pcs/hProduct Weight52-54kg10Delivery period  5 months 11Weight of Machine 30Ton Size of Machine[L x W x H ]  (M)12mx4.5mx7.2m12Total power 430KW13Average power Consumption 180KW Super Size Water Tank Blow Molding Machine
Super Size Water Tank Blow Molding Machine
Super Size Water Tank Blow Molding Machine
Super Size Water Tank Blow Molding Machine
Super Size Water Tank Blow Molding Machine

DELIVERY TIME  
5 months after the down payment;
TRAINNING

The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting; 

INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer's factory. After one week,if the Buyer still needs the training,$100 should be paid for the engineer.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's food & board while installation in buyer's factory.And the Buyer should also pay for the air ticket for the engineer.
GUARANTEE 

The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won't be listed in guarantee coverage.