PVC Twin Pipe Plastic Extrusion Production Line
Qingdao Suke Machinery Co., Ltd.- Product Type:PVC Pipe
- Screw No.:Double-screw
- Automation:Automatic
- Computerized:Computerized
- Certification:CE, ISO9001:2008
- Customized:Customized
Base Info
- Model NO.:SJSz51-105
- Condition:New
- Frequency Inverter:ABB or FUJI
- Contactor:Siemens
- Warranty:12monthes
- Raw Material:PVC Powder
- Temperature Controller:Omron
- Operator:2-3person ,Shift
- Power Supply:380V Three Phase
- Transport Package:PE Film and Wooden Package
- Specification:ISO9001 CE
- Trademark:SUKE
- Origin:Qingdao, China
- HS Code:8477800000
- Production Capacity:100sets,Year
Description
Basic Info.
Model NO. SJSz51-105 Condition New Frequency Inverter ABB or FUJI Contactor Siemens Warranty 12monthes Raw Material PVC Powder Temperature Controller Omron Operator 2-3person /Shift Power Supply 380V Three Phase Transport Package PE Film and Wooden Package Specification ISO9001 CE Trademark SUKE Origin Qingdao, China HS Code 8477800000 Production Capacity 100sets/YearProduct Description
PVC Twin Pipe Plastic Extrusion Production Line---- Machine's Introduction--
This line is used to produce pvc by twin screw extruder(SJSZ51x105)
The raw material is pvc powder
This line can produce two pvc pipes, diameter from 20-50mm at same time with two extrusion die.
Pipe size range ø20-50mm
Extruder SJSZ51/105 SJSZ65/132
Extruder power 22kw 37kw
Extrusion capacity135kg/h 250kg/h
Max. production speed120kg/h
----PVC Twin Pipe Extrusion Production Line consist of ----
1. SJSZ51x105 Twin Screw Extruder
2. Double Extrusion Die
3. Double Vacuum Shaping Tank
4. Double Haul-off Machine
5. Double Cutting Machine
6. Stacker.
Optional Auxiliary Machines
1.200/500 Mixer
2. SWP 360 Crusher
----TRADE TERMS-----
- Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
- Delivery Time: 40 days after receipt of prepayment.
- Packing Method: Packing film or wooden case
- Guaranteed Time: 12 months
----MACHINERUNNING TEST AND AFTER SERVICE----
- When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
- When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
- If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.
----COMPANY SHOW -----