Plastic Machinery

480 Ton Pet Bottle Injection Molding Machine

SHANDONG SHENG WO PLASTIC MACHINERY TECHNOLOGY CO., LTD.
  • Type:Preform Injection
  • Structure:Horizontal
  • Plastic Type:Thermoplastic
  • Plasticizing Way:Screw Type
  • Clamping Way:Hydraulic
  • Automation:Automatic

Base Info

  • Model NO.:480 ton
  • Computerized:Computerized
  • Certification:CE, ISO9001:2008
  • Weight:8600kg
  • Color:White and Orange
  • Producing:OEM ,ODM
  • Energy-Saving:Servo Motor
  • Warranty:12 Months
  • Transport Package:Whole Machine
  • Specification:6.7*1.7*2.2
  • Trademark:SENVO
  • Origin:Laiwu, China
  • HS Code:8477101090
  • Production Capacity:600PCS,Year

Description

SPECIFICATION OF ZS420SpecificationUnitABCInjection Volumecm³136216572128Injection Weightg125315241958Screw Diametermm687585Injection PressureM pa211172135Injection Speedcm³/s340413530Max. Plasticization CapacityKg/h r233294411Screw L/D RatioL/D23:121:119:1Max. Screw Speedrpm192Clamping  ForceK n4200Clamping  Strokemm720Space Between Tie Barmm x mm760x 710Max. Daylightmm 1470Mold Height(Min-Max)mm280-750Ejector Strokemm200Ejector ForceK n111Hydraulic System PressureM pa17.5Oil Pump Motor Powerkw48Heater  Powerkw24.2No. of  Heater Control Zonezone5Oil Tank CapacityL600Machine Dimension(L*W*H)m x m x m7.8x 1.9x 2.2Machine Weightkg15600
Note:
1. Customers offer the place for the sets of machine ,factory offer the design for the sets of machine.
2. payment:
T/T30%, ,70%.
30% as down payment to seller's account by T/T ,70% balanced after inspection and before shipping
3. shipping date:.
Within 30days after receiving the down payment
4. :
Installation and after-sale service:

The machine installation and debugging time should be within 5 days , before seller coming ,the buyer should keep everything ready. the warranty is 1 year ,within this term ,seller offer the easy-wearing parts to buyer for free ,and beyond this term ,seller offer a lowest price for the broken parts. For the installation and debugging workers from seller, the buyer should bear the cost for travelling, board and lodging ,and should pay 100USD/day for one worker .The training  site is fixxed by two parties