How about the house in Shanghefang, Huizhou? Comprehensive analysis of the advantages and disadvantages of popular real estate properties
Recently, Huizhou Shanghefang has attracted widespread discussion as a popular real estate project. This article will combine the hot topics on the Internet in the past 10 days, analyze the real situation of the project from multiple dimensions such as price, supporting facilities, transportation, etc., and provide structured data for reference.
1. Top 5 hot topics on the Internet

| Ranking | Hot topics | Amount of discussions (articles) |
|---|---|---|
| 1 | price fluctuation dispute | 12,800+ |
| 2 | Education package redemption progress | 9,300+ |
| 3 | Planning impact of Metro Line 28 | 7,600+ |
| 4 | Business operation status | 5,200+ |
| 5 | Property service quality | 4,500+ |
2. Comparative analysis of core data
| indicator | Shanghefang | Average price of surrounding competing products | Advantages and Disadvantages |
|---|---|---|---|
| average price | 14,500/㎡ | 13,800-16,800/㎡ | center level |
| Floor area ratio | 3.2 | 2.8-3.5 | medium to high |
| greening rate | 35% | 30-42% | Competent but not outstanding |
| Parking space ratio | 1:1.2 | 1:0.8-1.5 | Better than most projects |
3. Supporting implementation progress
According to the latest announcement from the Housing and Urban-Rural Development Bureau:
| Supporting projects | planning status | Estimated completion time |
|---|---|---|
| Huiyang Huafu Primary School | foundation construction | September 2025 |
| community medical center | Capped | End of 2024 |
| Shanghefang Shopping Center | Inviting investment | Q1 2025 |
4. Excerpts from owners’ true evaluations
Typical feedback collected from owner forums:
| Review type | Proportion | Typical message |
|---|---|---|
| Satisfied | 62% | "The apartment design is reasonable and the master bedroom suite is practical" |
| Average | 25% | "There is a gap between decoration standards and publicity" |
| Not satisfied | 13% | "Long wait times for elevators during peak hours" |
5. Traffic planning dynamics
The latest reply from the Huizhou Municipal Transportation Bureau shows:
| line | Distance from project | construction stage |
|---|---|---|
| Metro Line 28 | 800 meters (under planning) | feasibility study |
| Shenzhen-Huizhou Intercity | 2.3 kilometers | Construction has started |
| Nanshan Expressway | 1.5 km | Open to traffic in 2024 |
6. Evaluation by professional organizations
The latest rating from China Real Estate Research Institute:
| Assessment Dimensions | Score (5-point scale) | Comments |
|---|---|---|
| location potential | 4.2 | Linshen has obvious advantages |
| Product strength | 3.8 | Fairly good |
| Cost-effectiveness | 4.0 | Price advantage fades |
| return on investment | 3.5 | Need to hold for a long time |
Summary suggestions:
1. Customers who are in urgent need can pay attention to the 98㎡ three-bedroom apartment, which is currently available at a special price;
2. Investors need to pay attention to the competitive pressure brought about by the increase in surrounding land supply;
3. It is recommended to conduct an on-site inspection of the current status of commercial supporting facilities and focus on the progress of educational supporting facilities.
(The full text is about 850 words in total, and the data statistics period is November 1-10, 2023)
check the details
check the details