Plastic Machinery

PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line

Qingdao Suke Machinery Co., Ltd.
  • Product Type:PVC Pipe
  • Screw No.:Multi-screw
  • Automation:Automatic
  • Computerized:Computerized
  • Certification:CE, ISO9001:2008
  • Customized:Customized

Base Info

  • Model NO.:SJ65,28
  • Condition:New
  • Material:Stainless Steel
  • Power Supply:380V Three Phase
  • Control System:PLC Control System
  • Inverter:ABB
  • Intelligent Temperature Controller:Omron From Japan
  • Operator:2-3person ,Shift
  • Warranty:12monthes
  • After Sale Service:Life Long with Professional After Sale Team
  • Contactor:Schneider
  • Cooling Method:Recycling Water
  • Transport Package:as Export Standard for Plastics Machine
  • Specification:ISO9000 CE
  • Trademark:qdsuke
  • Origin:Qingdao, China
  • HS Code:84775900
  • Production Capacity:50sets,Year

Description

Basic Info.

Model NO. SJ65/28 Condition New Material Stainless Steel Power Supply 380V Three Phase Control System PLC Control System Inverter ABB Intelligent Temperature Controller Omron From Japan Operator 2-3person /Shift Warranty 12monthes After Sale Service Life Long with Professional After Sale Team Contactor Schneider Cooling Method Recycling Water Transport Package as Export Standard for Plastics Machine Specification ISO9000 CE Trademark qdsuke Origin Qingdao, China HS Code 84775900 Production Capacity 50sets/Year

Product Description

PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line
PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line

PVC Fiber Reinforced Soft Pipe Production Line



MACHINE INTRDODUCTION: 
The PVC and PE spiral reinforcing pipe have the advantage of pressure and corrosive resistance, negative pressure and bend resistance. It is used to convey the gas, liquid and powder material. It is widely used in industry, agriculture, archintecture, water conservancy irrigation and dust collector.
PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line




EQUIPMENT LIST: 
1. Single Screw Extruder
2. Mould
3. Water Cooling Tank
4. Haul-off Machine
5. Fiber Winding Machine
6. Printer
7. Oven
8. Cutter
9. Winding Machine

PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line

PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line
PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line
PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line
PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line
PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line




WHY CHOOSE SUKE?
(1) We have experiences in this field since 2002
(2) We have strong technical teams and cooperate with China scientific institution to develop, improve and test our machine, to ensure what customers get are the most reliable machines from China.
(3) We select the most reliable mechanical and electrical parts for our machine with all famous reliable brands, with European CE certificated.
(4) We put our heart into every business with aim of long term cooperation.
(5) We have perfect service system-- Our president is devoting himself to pre-sale, on-sale and after-sale service.

PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line


MACHINE TYPE: 
Machine Type Raw Material Diameter Voltage Output
SJ145x28PVC Granule10-50mm380V/3P40-60kg/h
SJ65x30PVC Granule60-200mm 380V/3P80-100kg/h


PVC Fiber Reinforced Garden Hose/Soft Pipe/Tube Extrusion Machine Production Line 

TRADE TERMS
  1. Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
  2. Delivery Time: 40 days after receipt of prepayment.
  3. Packing Method:  Packing film or wooden case
  4. Guaranteed Time:  12 months

MACHINERUNNING TEST AND AFTER SERVICE
  1. When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
  2. When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
  3. If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours. 


COMPANY SHOW: