Waste Plastic Film Granule Making Machine Plastic Recycling Machine
Ruian Hoin Machinery Co., Ltd.- After-sales Service:Technical Support Online
- Warranty:One Year
- Material Processed:Film
- Plastic Type:PE
- Screw:Single-Screw
- Automation:Automation
Base Info
- Model NO.:SLZ-90-150
- Computerized:Non-Computerized
- Certification:ISO9001:2008, CE
- Certificate:Ce,ISO9001
- High Output:200kg,H
- Screw Material:38 Chrome Molybdenum Aluminium
- Main Motor:Inverter Control
- Guarantee:One Year
- Transport Package:Stretch Film or Wooden Case
- Specification:CE, ISO9001
- Trademark:HOIN
- Origin:Ruian, Zhejiang, China
- HS Code:84772010
- Production Capacity:20 Set,Month
Description
Basic Info.
Model NO. SLZ-90-150 Computerized Non-Computerized Certification ISO9001:2008, CE Certificate Ce,ISO9001 High Output 200kg/H Screw Material 38 Chrome Molybdenum Aluminium Main Motor Inverter Control Guarantee One Year Transport Package Stretch Film or Wooden Case Specification CE, ISO9001 Trademark HOIN Origin Ruian, Zhejiang, China HS Code 84772010 Production Capacity 20 Set/MonthProduct Description
A.Product Description:
1) The hard machine faces the appropriation deceleration box;
2)The 38 CrMOLA downplays to anticipate the tube pole; Line up the spirit adoption takes out the
vacuum method, guarantee
that the few son has no spirit Bore;
3)Don't shut down to change the net machine; Cool off the sink;
4) Blow the dry breeze machine;
5)Roll the knife type slices a machine.
6)It is suitable for PP,HDPE, LDPE, LLDPE, MDPE, , etc material recycle and granulate.
B.Main Technology:Model | SLZ-B100/90 | SLZ-B120/110 |
Screw dia(mm) | Φ100 Φ90 | Φ120 Φ110 |
Screw Material | 38CrMoALA | 38CrMoALA |
Screw L/D | 22:1 | 22:1 |
Screw rotation | 10-100r/min | 10-100r/min |
Main motor(kw) | 40KW | 80KW |
Max.extrusion output | 90kg/h | 150KGS/H |
Weight (kg) | 3000KGS | 3600KGS |
Dimension LxWxH(mm) | 8000x1200x1800 | 8800x1300x1800 |
C.Pictures of Machine Details
HOIN WORKSHOP
MORE PRODUCTS:
AFTER SERVICE OF HOIN:
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USDper day per person.
4. How long of your machine's warranty period?
machines have one year guarantee after finishing installation under normal operation.
5. How could we do after one year warranty period?
We also can offer you our best after service, of course you will afford our technician's cost.
6. How could we do if the parts broken within of after warranty?
We will express the free replacement parts during the warranty date and also send you parts needed by value after warranty.
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineers have rich experience for installingmachines over seven years. In addition, they also can communicate with you using their body language vividly.
8. Can you find us any engineer in our location?
Of course, we will check and inform you as soon as possible.