-
Manual Hollow Block Making Machine
Basic Info. Model NO. psb-dz200~600
-
Polyurea and Polyurethane Spray Equipment Cnmc-500 From Manufacturer
ItemCNMC-500 Hydraulic polyurea spraymachineStandardconfigurationProportionFixedMainframe: 1setSelf-cleaningspraygun: 1setFeedingpump: 2setsHeatinghose: 49.2feet(15m)Connectinghosefromfeedingpumptomachine: 10feet(3m)Connectinghosefromheatinghosetogun: 5feet(1.5m)RingsandToolsTechnicalDataTheratioofr
-
PU Foaming Machine for Insulated Pipe PU Insulation Materials Filling
Basic Info. Model NO. LXPU-H
-
Automatic EPS Foam Cuter for EPS Foam Cutter for Thermocol Plate Machine
TECHNICAL DATAItemUnitParametersMax cutting block sizemm4000*1500*(1250~1500)Cutting wiremmΦ 0.4 G20Ni80Stepping motor torqueN. m18PowerKw5Cutting speedm/min0~4Cutting transferCapacityKVA3VoltageV0~70(adjustable)Overall dimensionmm5500*2500*2
-
KW-520C foam gasket sealing strip making machine
Electric powerVoltage3X380V( It can be designed base on customer request)Power5.5kwAirDry compressed air≥6barWaterClean tap waterMixing and Dispensing:Mixing head model:KW-600Dimension:410*200*135mmWeight:4.6KGColour: SilverOutput:1-4g/sRepeated glue output precision:1%(weight test)Pressure contr
-
Reanin K6000 High Pressure Hydraulic Mixing Anti-Corrosion Polyurea Spray Machine
Basic Info. Model NO. K6000
-
Fruit Pack Net Machine Foam Net Making Machine
ModelJC-FPG65JC-FPG75JC-FPG90JC-FPG105JC-FPG120JC-FPG150JC-FPG180IDmm4-206-358-4510-6015-8520-8025-120ODmm15-3020-4530-6040-8050-9060-10080-150Outputkg/h2535455570120160Installed PowerKW45556268981321683.Machine details:4. FAQ:Q1:Why Ichoose your factory?We engaged in EPE foam machinery production m
-
KW-520D Gasket Sealing Machine with Great IP Grade
Electric powerVoltage3X380V( It can be designed base on customer request)Power5.5kwAirDry compressed air≥6barWaterClean tap waterMixing and Dispensing:Mixing head model:KW-600Dimension:410*200*135mmWeight:4.6KGColour: SilverOutput:1-4g/sRepeated glue output precision:1%(weight test)Pressure contr
-
Jxpu-Y180 High Pressure PU Panel Production Line
Overview Product ParametersCompany ProfileCertificationsInstallation InstructionsTheinitialinstallationisnotincludedwiththeprofessionalmember.Allinstallationwithourteammustbescheduledatleast4weeksinadvancebeforeactualtriptaken.Allnecessaryconnectivitymustbereadypriortheservicebein